CIP redesign cut water consumption by a third.
A mid-sized dairy plant was running CIP cycles inherited from a 2008 retrofit. Water and chemical use had crept up; cycles overran shift handovers; QA was flagging recurring swab failures on a yogurt line.
Audited 14 CIP circuits, rebuilt the design from flow-velocity first principles, redesigned spray geometry on three vessels, and rewrote validation protocols against current EHEDG guidance.